Skip to content
+971 55 131 0385 Book a Visit

Swimming Pool Care · Case Study

Green pool recovered and stabilised on a proper chemical schedule

Palm Jumeirah

Palm Jumeirah Frond villa, private pool
Clear infinity pool at a Palm Jumeirah villa

The problem

Pool green and opaque after several weeks without maintenance during peak summer, with the owner unsure whether draining was necessary.

Diagnosis

Testing showed chlorine effectively at zero with pH and stabiliser well out of range, allowing algae to establish. Filtration was functional, so draining was not required.

Work completed

Shock treatment applied, filtration run continuously, surfaces brushed across repeated visits, filter backwashed and media checked, then water balanced and held stable before handover.

Materials & solution

Shock treatment and balancing chemicals, filter media inspection and partial replacement.

Result

Water returned to clear and swim-ready without draining and refilling, then placed on a weekly maintenance schedule with readings recorded each visit.

Project imagery is representative. Photographs, customer feedback and project dates are added only with the customer's written permission.

Similar problem in your property?

Send photos on WhatsApp or call us. We'll tell you the likely cause and whether it needs an inspection first.

Call WhatsApp