This is room-level renovation, not cabinet-level carpentry. If your existing kitchen doors need realigning or refacing, our carpentry team handles that as a repair. This page is for renovating the kitchen: cabinetry, worktops, appliances, and the plumbing and electrical that moving any of them actually requires.
- Serving all of Dubai
- Price agreed before work
- Trade specialists, not generalists
The short answer
Kitchen Renovation in Dubai — what's involved
A kitchen renovation in Dubai is sequenced around its utilities: survey and itemised scope, building or community NOC, strip-out, plumbing and electrical relocation for the new layout, cabinetry installation, worktop templating and fitting, appliance connection, then finishing and handover. Worktop templating is the timing hinge — stone is measured off the installed cabinets and fabricated afterwards, which is why a realistic programme shows the kitchen partially usable mid-project rather than promising an unrealistic straight run.
What this service covers
Exactly what our specialists do on this type of job — so you can tell whether this is the right page for your problem.
Cabinetry & worktops
New cabinet runs installed level and square, worktops templated and fitted after the carcasses are in.
Plumbing & drainage moves
Sink, dishwasher and washing machine positions re-plumbed with proper falls and tested connections.
Electrical for the new layout
Hob, oven and appliance circuits, sockets and task lighting installed to regulation by certified electricians.
Finishing & handover
Splashbacks, sealing, painting and a snag check with every appliance and connection tested.
Moving a sink or hob is a utilities project
The drawing makes it look simple: the sink goes to the island, the hob moves to the wall. In reality the sink needs supply and drainage with a proper fall, the hob may need a new dedicated circuit, and the extract route decides more about the layout than the cabinets do. That rerouting is real plumbing and electrical work inside walls and floors, and it has to be finished, tested and inspected before a single carcass is installed.
Because those are trades we run in-house, the rerouting is scoped and priced up front — not discovered as a variation after your old kitchen is already in a skip.
Downtime, honestly
You will be without a fully working kitchen for part of the project, and anyone who promises otherwise is planning to disappoint you. What good sequencing does is compress and structure that window: strip-out and first-fix first, cabinets in, then the worktop templating-to-fitting gap — during which the sink and hob are not yet connected — then appliances and finishing.
We give you that sequence with dates before work starts, tell you which days the kitchen is genuinely unusable, and reconnect essentials as early as the programme honestly allows.
Scoped to what we actually are
This is specialist-led kitchen renovation within your property's existing envelope — cabinetry, worktops, utilities, finishes, and modest layout changes where services allow. Structural alterations, wall removals and full-villa reconfiguration belong with a structural contractor, and we tell you that at survey rather than improvising.
Everything in scope is itemised in a fixed quotation: cabinetry, worktop material, appliance connections, utility moves and finishing, with supply-by-you versus supply-by-us stated per item.
How working with us works
Four steps, in the same order every time — so you always know what happens next and what it costs.
Tell us what's happening
Call or WhatsApp a short description — photos help. We confirm whether the job needs an inspection or can be booked straight away.
Inspection & diagnosis
A specialist attends, tests the system and identifies the actual cause rather than treating the symptom.
Clear scope & price before work
You receive the findings, the recommended fix, and the cost in writing. Nothing proceeds until you approve it.
Work completed & tested
The job is carried out, tested in front of you, and the area is left clean. You get a record of what was done.
What affects the price
We do not publish flat rates for work we have not seen. These are the factors that change the number, so nothing on your quote is a surprise.
- Cabinetry extent and specification, and whether carcasses are replaced or refaced
- Worktop material — laminate, quartz and natural stone carry very different fabrication costs
- How far plumbing and electrical must move to serve the new layout
- Appliance integration, and building NOC, hours and access requirements
Kitchen Renovation questions
How long is a kitchen unusable during renovation?
Depends on scope, but the honest answer is: from strip-out until the worktop is fitted and the sink reconnected — typically the middle one to two weeks of the programme. We state the exact window in your schedule before work begins.
Is this different from your carpentry cabinet work?
Yes. Carpentry repairs and realigns your existing kitchen — hinges, doors, runners. Renovation replaces the kitchen: new cabinetry, worktops and the utility work behind them.
Can you renovate the kitchen and a bathroom together?
Yes, and it is often more efficient — shared strip-out, one NOC process and one team sequencing both rooms. We programme them so you are never without both a kitchen and a bathroom at once.
Useful next steps
Go directly to the most relevant service or completed-project example.
Popular Dubai areas for kitchen renovation
We cover villa communities, apartment towers and commercial premises across Dubai, and handle building access and permitted-hours requirements as part of the job.
Other renovation work we handle
Need kitchen renovation in Dubai?
Call us or send photos on WhatsApp. We'll tell you whether this needs an inspection first or can be booked straight in, and what it will cost before anyone starts.